Construction of a 32.5 km long high pressure DN1000 MOP 8.4 MPa gas pipeline from ZZU Czeszów to the Kiełczów node together with the necessary supporting infrastructure (two dam and relief systems with bypass in Miłonowice and Kiełczów nod area) as part of construction of ‘Polish border’ (Lasów) – Taczalin – Radakowice – Gałów – Wierzchowice gas pipeline Length 32.5 km.