GAZ-SYSTEM CZECZÓW-KIEŁCZÓW GAS PIPELINE

Energy
2016-2018
Taczalin – Wierzchowice
Approximately 144 mln PLN

Construction of a 32.5 km long high pressure DN1000 MOP 8.4 MPa gas pipeline from ZZU Czeszów to the Kiełczów node together with the necessary supporting infrastructure (two dam and relief systems with bypass in Miłonowice and Kiełczów nod area) as part of construction of ‘Polish border’ (Lasów) – Taczalin – Radakowice – Gałów – Wierzchowice gas pipeline Length 32.5 km.

33. GAZOCIĄG CZECZÓW-KIEŁCZÓW

Copyright © 2022. All Rights Reserved. Designed by i1 Group