MODERNISATION OF THE FLOOD PROTECTION INFRASTRUCTURE OF THE NYSA RESERVOIR

Hydroengineering
2012-2015
Nysa
Approximately 259,1 mln PLN

Reconstruction and flood-related
improvement of the flow capacity of Nysa Kłodzka river along the section from the Nysa reservoir (rkm 65+100) to the Kubice area (rkm 55+100) including the existing structures; modernisation of the reservoir buildings and structures as well as construction of other essential reservoir facilities and structure.

Copyright © 2022. All Rights Reserved. Designed by i1 Group