INSTALLATION OF ERTMS/ETCS SYSTEM ON THE 278 WĘGLINIEC-ZGORZELEC LINE

Railway
Since 2018
Węgliniec - Zgorzelec
Approximately 42,5 mln PLN

Installation of The European Rail Traffic Management and European Train Control Systems (ERTMS/ETCS) Level 3 along E30 line from Węgliniec station to Zgorzelec – National Border station

Copyright © 2022. All Rights Reserved. Designed by i1 Group